Footbridge closed 23 December 2020 for tree work

There are some dangerous tree branches around the footbridge that need to be sorted out. Today (Thursday 17 December 2020) we received the following advice from Stephan Titze, Parks and Property Project Lead, at Horowhenua District Council:

Treescape has scheduled the previously discussed removal of overhanging and dead branches next to the Waikawa Beach Pedestrian Bridge for the 23rd December [2020].

Please note that during this time of work the bridge needs to be closed for the public to ensure a safe environment.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

Waikawa Beach or Manakau

New Zealand

Other